落脚河水电站钢筋混凝土岔管有限元分析

马文亮,白新理,张多新,刘琰玲

马文亮,白新理,张多新,刘琰玲. 落脚河水电站钢筋混凝土岔管有限元分析[J]. 水利水运工程学报, 2006, (2): 47-50.
引用本文: 马文亮,白新理,张多新,刘琰玲. 落脚河水电站钢筋混凝土岔管有限元分析[J]. 水利水运工程学报, 2006, (2): 47-50.
MA Wen-liang,BAI Xin-li,ZHANG Duo-xin,LIU Yan-ling. Finite element analysis for reinforced concrete bifurcation pipe in Luojiaohe Hydropower Station[J]. Hydro-Science and Engineering, 2006, (2): 47-50.
Citation: MA Wen-liang,BAI Xin-li,ZHANG Duo-xin,LIU Yan-ling. Finite element analysis for reinforced concrete bifurcation pipe in Luojiaohe Hydropower Station[J]. Hydro-Science and Engineering, 2006, (2): 47-50.

落脚河水电站钢筋混凝土岔管有限元分析

详细信息
  • 中图分类号: TV314

Finite element analysis for reinforced concrete bifurcation pipe in Luojiaohe Hydropower Station

  • 摘要: 对落脚河水电站钢筋混凝土岔管进行了三维有限元分析。计算了在施工和运行过程中的6种组合工况下钢筋混凝土岔管的应力和变形。同时,经分析认为在岔管相贯部位采取了加腋措施,可有效缓解岔管部位的应力集中。
    Abstract: Three-dimensional finite element analysis for the reinforced concrete bifurcation pipe in Luojiaohe Hydropower Station is carried out. The stress and deformation of the reinforced concrete bifurcation with six combined operating conditions in the phases of construction and operating are calculated. Meanwhile, the intersection part of the bifurcation pipe is haunched, which helps to relief the stress concentration of the bifurcation pipe.