基于模糊数学理论的大坝风险后果综合评价
详细信息Comprehensive hazard assessment model for consequences caused by dam failure based on fuzzy mathematics method
计量
- 文章访问数: 610
- HTML全文浏览量: 71
- PDF下载量: 493
引用本文: | 孙玮玮,李雷. 基于模糊数学理论的大坝风险后果综合评价[J]. 水利水运工程学报, 2010, (4). |
Citation: | SUN Wei-wei,LI Lei. Comprehensive hazard assessment model for consequences caused by dam failure based on fuzzy mathematics method[J]. Hydro-Science and Engineering, 2010, (4). |